Looking for previously purchased publications?
Search publications 1899-2013 in our archives
Non-member price: £6.00
Member price: Free
Ammonia chiller case study Heathrow T5
The paper describes the design and construction of the Energy Centre for the Terminal 5 development at London’s Heathrow airport. T5 consists of a series of large buildings and infrastructure with their own utility services. All heating water, cooling water and domestic water is supplied by a central energy centre.
The paper further describes the ammonia chillers selected for the project from the perspective of the supplier and provides an insight into: the challenges presented by the cooling needs of the Terminal 5 project the development and management of the T5 project building services by SPIE Matthew Hall; the selection and application of chillers for the project and why ammonia refrigerant was chosen; the design concept, construction and testing employed.
Members - login to download this pdf free.
Non members - either click on the basket to purchase this item (prices include VAT) or become a member and receive this and other publications free.