Looking for previously purchased publications?
Search publications 1899-2013 in our archives
Non-member price: Not available
Member price: Free
Temperature Pull Down of New Cold Rooms and Cold Stores (GPG 13)
For new Cold Rooms operating below 0°C it is essential that the temperature pull down is carried out correctly to avoid damage to a new cold room concrete floor. This bulletin outlines the correct procedures for a new cement concrete floor which would normally be installed by a specialist contractor.
Members - sign in to your web account to download this free pdf.
Not a member? Subscribe to our Technician mailings to download this and other publications.
Log in to your account (top right) to download this free guide.